To definitively and easily document the exact state of verification, you need to add traceability to the design verification process.
This is especially critical for meeting functional safety (FuSa) specifications for traceability, such as those in ISO 26262 and DO-254.
Provable, Documented Status of Verification
While design and verification teams may have solutions in place for requirements, design, and verification management, these solutions are often not connected and lack any communication between all three domains.
In this white paper, learn how the Methodics IPLM links requirements, design, and verification together to provide a fully traceable model between all three systems with discussion of:
- Managing verification.
- Workspaces and BoMs.
- Connecting requirements to releases.
- Connecting tests to releases.
- Building verification history.
- Verification traceability.
Fill out the form to get access to this white paper and learn how Methodics IPLM provides the traceability needed for your design verification process.